And now Tesla also attacks Germany. The company's decision to confirm Berlin as the headquarters of Gigafactory was greeted with optimism on the market, as Tesla shares closed on 12 November, when the company CEO Elon Musk confirmed the news.
Now details emerge on various aspects, from the entity of the investment envisaged by Tesla and on the number of cars that the plant will be able to produce in a year, when the plant will operate at full capacity. Meanwhile, note the precise location of the plant, or the German federal state of the Brandenburg, in the municipality of Grnheide located south-east of Berlin, as reported by Der Tagesspiegel.
Tesla's latest Gigafactory will be built on a 300-hectare site directly at the exit Freienbrink of the Berlin ring road. The plant will also be near the station Fangschleuse on the R1 line connecting Berlin and Frankfurt, and producing at full capacity 150 thousand vehicles per year, just like Gigafactory 3.
According to the German press, Tesla plans to invest about 4 billion euros in the construction of the plant that will be fully operational by 2021. The company will initially employ 3 thousand employees in the factory, but this number may go up to 8 thousand units when Gigafactory 4 will be fully operational.
The works should start early next year with Tesla, which hopes to get funding for 300 million euros to start building the plant. Dietmar Woidke, minister president of Brandenburg, confirmed that the chancellery of his state will create a new task force to facilitate the operations of the American company, fulfilling a personal promise to Elon Musk himself.
Minister President Dietmar Woidke also suggested that the Brandenburg factory will not be Tesla's only factory in Germany. American society could also build a battery plant a Lusatia.
Even if the position in which Gigafactory 4 will be built, classified as an industrial area, the construction of the interested plant will be in any case 300 hectares of pine forest. Tesla, in collaboration with the German Federal Ministry of the Environment, committed itself to preserving nature and planting a number of trees three times higher than those that will be felled to build Gigafactory 4.
The first Tesla Gigafactory was built in Nevada in 2015, with the factory that mainly deals with the construction of batteries. In fact, the name was established to remember that batteries with a capacity in the order of GW / h are designed inside. The batteries are made in Nevada, but are then transferred to the Fremont plant for final assembly of the car. The Gigafactory 2 is instead in Buffalo, while with the Chinese Gigafactory 3 Tesla has had a more "integrated" approach, since it is capable of assembling batteries and cars within the same structure.
Source link
https://auto.hwupgrade.it/news/tecnologia/tesla-gigafactory-4-in-germania-costera-4-miliardi-di-euro-e-impieghera-3-mila-dipendenti_85591.html
Dmca